3) Changes in the Group structure, main acquisitions and divestments

During 2014, 2013, and 2012, the main changes in the Group structure and main acquisitions and divestments were as follows:

2014

• Upstream

  • TOTAL finalized in March 2014 the sale to Sonangol E&P of its interest in Block 15 / 06 in Angola.
  • TOTAL finalized in March 2014 the acquisition from InterOil Corporation of a 40.1% interest (before possible entry by the State) in Block PRL 15 containing the gas field Elk-Antelope in Papua New Guinea for an amount of $429 million, paid on April 2, 2014.
  • On February 27, 2014, TOTAL floated GazTransport et Technigaz S.A. (GTT), an engineering company specializing in the design of cryogenic membranes for the transport and storage of LNG. With this quotation on Euronext Paris, TOTAL reduced its interest in the equity of the company from 30.0% to 10.4%. The listing was completed at a price of €46 per share, valuing 100% of the equity of the company on the listing date at €1.7 billion. Finally in December total signed a final agreement for the acquisition by Temasek its entire remaining interest in GTT. The total of these two transactions amounted to more than $650 million.
  • TOTAL finalized during 2014 the acquisition of an additional 1.28% interest in Novatek for an amount of $434 million, bringing TOTAL’s overall interest in Novatek to 18.24% as at December 31, 2014. Since July 18, 2014, the Group has not acquired any additional shares of Novatek. 
  • TOTAL finalized in August 2014 the sale of its 10% interest in the Shah Deniz field and the South Caucasus Pipeline to TPAO, the Turkish state-owned exploration and production company for an amount of $1,513 million. This sale generated a gain on disposal of $580 million after tax.
  • TOTAL finalized in October 2014 the sale of its 25% interest in the Cardinal Gas Services LLC, a company specializing in the gathering and transport of gas in Ohio’s Utica shale play area for
  • an amount of $449 million.
Information relating to sales in progress is presented in accordance with IFRS 5 “Non-current assets held for sale and discontinued operations” in Note 34) 'Changes in progress in the Group structure".

2013

• Upstream

  • TOTAL finalized in February 2013 the acquisition of an additional 6% interest in the Ichthys Liquefied Natural Gas (LNG) project from its partner INPEX. TOTAL’s overall equity stake in the Ichthys LNG project increased from 24% to 30%.
  • TOTAL finalized in February 2013 the sale to INPEX of a 9.99% indirect interest in offshore Angola Block 14.
  • On March 27, 2013, TOTAL entered into an agreement for the sale to Suncor Energy Inc. of its 49% interest in the Voyageur upgrader project, which is located in the Canadian province of Alberta and intended to upgrade bitumen from the Fort Hills and Joslyn mines. The transaction amounted to $506 million (€381 million). The mining development projects of Fort Hills and Joslyn continue according to the production evacuation logistics studies jointly conducted with Suncor. The sale entails a net loss of €1,247 million.
  • TOTAL finalized in June 2013 the sale of a 25% interest in the Tempa Rossa field in Italy to Mitsui.
  • TOTAL finalized in July 2013 the sale of 100% of Transport et Infrastructures Gaz France (TIGF) to a consortium comprising Snam, EDF and GIC (Government of Singapore Investment Corporation) for an amount of €1,558 million, net of cash sold.
  • TOTAL finalized in September 2013 the sale of its Upstream interests in Trinidad & Tobago to The National Gas Company of Trinidad & Tobago for an amount of €236 million ($318 million), net of cash sold.
  • TOTAL finalized in December 2013 the acquisition by Qatar Petroleum International Upstream of 15% of the capital of Total E&P Congo through a capital increase of €1,225 million ($1,627 million).
  • TOTAL finalized during 2013 the acquisition of an additional 1.62% interest in Novatek for an amount of €437 million ($587 million), bringing TOTAL’s overall interest in Novatek to 16.96% as at December 31, 2013.
  • In October 2013, a consortium in which TOTAL holds a 20% interest was awarded a production sharing contract for 35 years to develop the Libra oil field in Brazil. TOTAL paid a signing bonus of 3,000 million Brazilian Real (approximately $1,301 million).

• Refining & Chemicals

  • TOTAL finalized in June 2013 the sale of its fertilizing businesses in Europe.

2012

• Upstream

  • TOTAL finalized in February 2012 the acquisition in Uganda of a one-third interest in Blocks 1, 2 and 3A held by Tullow Oil plc for €1,157 million ($1,487 million), entirely consisting of mineral interests. TOTAL became an equal partner with Tullow and CNOOC in the Blocks, each with a one-third interest and each being an operator of one of the Blocks. TOTAL is the operator of Block 1.
  • TOTAL finalized during 2012 the acquisition of an additional 1.25% interest in Novatek for an amount of €368 million ($480 million), increasing TOTAL’s overall interest in Novatek to 15.34% as at December 31, 2012.
  • TOTAL finalized in October 2012 the sale of its interest in the Cusiana field as well as a participation in OAM and ODC pipelines in Colombia to Sinochem, for an amount of €318 million ($409 million), net of cash sold.

• Holding

  • During 2012, TOTAL gradually sold its remaining interest in Sanofi, generating a net capital gain of €341 million after tax. As at the December 31, 2012 the Group retained no further interest in the capital of Sanofi.